Clean Room Transfer Window Stainless Steel Double Layer Dynamic Pass Through Box for Lab
- PRODUCT DETAILS
- RELATED PRODUCTS
PRODUCT DETAILS

Pass Box: The Contamination Barrier for Cleanrooms
As a "transition hub" between clean and non-clean areas, the Pass Box is a key equipment for controlling cross-contamination and ensuring the stability of the clean environment. With its design featuring air self-purification, sealed isolation and air flow control, it can intercept pollutants during material transfer, preventing the clean area from being compromised by material entry and exit. Widely applicable to scenarios with strict cleanliness requirements such as pharmaceuticals, electronics, food, and biological laboratories, it enables efficient and safe material transfer.
- Double Sealing + Air Self-Purification, Zero Dead Ends in Contamination Interception
- Interlocking Safety Design, Avoiding the Risk of Direct Air Flow
- Corrosion-Resistant and Easy-to-Clean Material, Adapting to Complex Working Conditions
- Intelligent and Convenient Operation, Adapting to Diverse Needs
-
Flexible Adaptation, Zero Threshold for Installation and MaintenanceSpecificationsStatic Pass BoxDynamic Pass BoxWorking Dimensions500×500×500600×600×600CustomizedModel NoSHPDPB001SHPDPB002SHPDPBXXXMaterialSS304,SUS304,SS Sheet,Thick.=1.0,1.2mmGlassDouble Tempered Glass,Thick.=5mmHingeMechanic/Electronic Interlocker SystemPower Supply220V,50HZUV LightYESYESAir VelocityN/A0.3m/s-0.6m/sHEPAN/AEU 14 grade with an efficiency of 99.990% for 0.3 mic.(GEL TYPE)PrefilterN/AEU 4 grade with an efficiency of 90% for 10 mic.AccessoriesN/APAO test port Of HEPA,High Efficiency Differential Pressure Gauge
1. Observation Window 2. Interlock Sys term3. UV Germicidal Lamp
4. differential Pressure Gauge 5. High Efficiency Filter6. Arc Corner
Detection Port

Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.
EN
AR
BG
HR
CS
DA
FR
DE
EL
HI
JA
IT
KO
PL
PT
RU
RO
ES
SV
ID
VI
TH
TR
FA
MS
GA
SW
BE
UR
BN
BS
MR
MN
PA
UK
NL
NO
SK
LO
LA


















